The machine moulds around the clock. What happens between two shifts, two moulds and two granulate batches, on the other hand, often gets lost.
Manufacturing software for plastics processing has to hold on to three things that change constantly in injection moulding: the mould, the material batch and the shift. Caesar captures setup, good parts and scrap on the order, carries the granulate batch used and writes everything to SAP Business One through the official SAP Service Layer.
That makes Caesar an injection moulding MES that needs no modifications to your machines. Capture happens in the browser on existing PCs or tablets right at the machine, in a few seconds per confirmation.
What slips through the gaps in injection moulding
Mould changes without a timestamp
Remove, install, heat up, run in, until the first good part comes out. If that is not captured as setup, it later looks as if the machine simply produced slowly.
The granulate batch is unknown
When a defect turns up at the customer, the first question is: which material batch is in these parts? If it is only written on a bag tag at the dryer, the guesswork begins.
Scrap in the monthly average
Start-up scrap after a mould change, defects after a material change, scrap on the night shift: in the monthly average it all looks the same. The cause disappears into the total.
Shift handover by word of mouth
What happened with the mould overnight is on a slip of paper or in the memory of a colleague who has already gone home. The early shift starts with questions.
What Caesar takes over in plastics processing
Record mould, material and shift on the order instead of reconstructing them later.
Setup as a state of its own
Mould changes and run-in are captured as setup time, separate from run time. You see how much machine time goes into changeovers and which orders are especially setup-heavy.
Granulate batches on the order
The batch of material used is carried along with the order. When a customer asks, the path leads from the finished part back to the material batch without anyone digging through folders.
Good parts and scrap kept apart
Both are captured at confirmation, per order and operation. Scrap after a mould or material change can be assigned to the order instead of just being counted.
Multi-cavity and family moulds
If one mould produces parts for several orders at once, you confirm them in one step with a batch posting instead of opening each order separately.
Shift handover with tasks
Open points such as a suspicious cavity or a mould due for maintenance are logged as a task. The next shift finds them in Caesar instead of searching for the slip.
Inspection after start-up
The QA module lets you record inspections and measured values on the order, for example the first-part inspection after a mould change. The result stays with the order, not in a separate folder.
Why changeovers are so expensive in injection moulding
In injection moulding, run time is usually easy to calculate: cycle time times shot count. What is hard to pin down is everything before it. A mould change with heating and run-in costs machine time in which no saleable part is made, and start-up scrap comes on top. If you do not see that separately, you price small call-offs too cheaply.
Then there is the material change. A different colour or a different granulate means purging and scrap until the part is right again. In the Leitstand you see your machine loading on a graphical scheduling board and can sequence orders so that changes are needed less often.
Shop-floor data capture in plastics processing: start without a machine interface
Many injection moulders run machines from different manufacturers and of different ages. Data capture that only works once every machine is connected turns into an interface project before it delivers any benefit.
Caesar therefore relies on confirmation by the people at the machine: start, stop, setup, good parts, scrap, in a few seconds. Automatic transfer of machine and sensor data is being developed with Brutus and is not available yet. The capture that exists today has been proven in daily shift operation at our reference plant, Efinger-Instruments.
From the finished part back to the material batch
In a complaint, the material batch is almost always the first lead. Was it the granulate, the drying, the mould? Without an assignment, the only option is to block every part from the period in question, because nobody can narrow down which ones are really affected.
Caesar carries batches and serial numbers along with the order, and the data sits in SAP Business One. That lets you narrow down which orders were made with which batch. What this means for your customers’ requirements we work out in the demo on a concrete example.
FAQ
Does Caesar read data directly from our injection moulding machines?
No, not today. Caesar captures through confirmation at the workstation. Automatic connection of machine and sensor data is coming with Brutus, which is currently in development. We tell you openly what of that becomes an option for you and when, and we do not promise anything that is not running yet.
How do we capture parts from multi-cavity moulds?
Operators confirm good parts and scrap on the order. With family moulds that produce several items at once, batch postings let you confirm several orders in one step. What works best for your moulds and cavities we walk through on a real example.
How does the granulate batch get onto the order?
The material batch used is recorded on the order and carried along, and the batch data sits in SAP Business One. At which point your operators book it, for example when filling the dryer or when starting the order, we decide together during the rollout.
Does this work in three-shift operation?
Yes. Caesar is cloud-based and runs in the browser, so it works at night and at weekends when nobody is in the office. Confirmations are visible immediately, and open points can be handed to the next shift as a task.
Does this require SAP Business One?
Currently yes. Orders, items and batches stay in SAP Business One, and Caesar reads and writes through the official SAP Service Layer. If you use a different ERP, we will tell you honestly whether and when Caesar becomes an option for you.
Show us a mould change from your shop floor
30 minutes, live from the reference plant. Together we go through how setup, batch and scrap would be confirmed in your plant.