Quality inspection

Quality inspection for SAP Business One: an inspection plan, not a binder

Inspection happens where the part is. The measured value lands on the order, and when something deviates it gets a number, a deadline and an effectiveness check.

Quality inspection with SAP Business One works best when inspection plan, measured value and order belong together. Caesar adds the QA module to SAP B1: inspection orders by inspection plan with blocking logic, measured values instead of tick boxes, deviations with corrective action and an effectiveness check. The results are attached to the order and the batch.

That way an inspection result is no longer a page in a binder but part of the order's history. Anyone who later asks how a lot was inspected finds the answer where quantities, times and batches are recorded too.

Where quality inspection breaks down day to day

Inspection records on paper

The form sits at the machine, the order in the ERP. Anyone looking for an inspection result three months later first has to find the right binder.

Ticked instead of measured

A tick next to “OK” says someone was satisfied. It does not say how close the dimension was to the tolerance limit. That is exactly what you need when a process slowly drifts.

Deviations that never close

A defect is reported, an action is agreed and then forgotten. Nobody checks whether it worked until the same defect turns up again.

Uninspected goods in stock

When goods receipt and inspection are not connected, material moves into stock before anyone has looked at it. It gets noticed in production.

What the Caesar QA module takes on

Inspect, measure and follow up in the same software the shop floor uses to produce and confirm.

Inspection plans for QA-relevant items

For items you flag as subject to inspection in SAP Business One, you store an inspection plan. The inspection is defined up front rather than left to memory.

Measured values instead of ticks

Characteristics are recorded with their measured value, good parts and scrap counted separately. Individual inspections build up into a history in which drift becomes visible.

Inspection orders with blocking logic

What has not been inspected stays blocked. Only a completed inspection releases the goods, and the result belongs to the item and the batch, not to a loose form.

Goods receipt with a QA warehouse

Deliveries subject to inspection go to the QA warehouse first. Only after the inspection is complete are they transferred to the standard warehouse.

Deviation, action, effectiveness

Every deviation gets a number, a responsible person and a deadline. The effectiveness check later shows whether the action held.

Drawings by scan

With the scan function the drawing comes into the inspection instead of lying next to it on the bench. Photos and inspection reports can be stored with the inspection.

Inspection plans in SAP B1: from characteristic to measured value

Out of the box, SAP Business One has no dedicated quality module with inspection plans and measured values. Many companies make do with spreadsheet templates and forms that run alongside the ERP. That works as long as nobody needs to compare results across lots or assign them to a specific batch.

In Caesar the inspection plan is stored on the item you flag as QA-relevant in SAP B1. During inspection it guides through the characteristics, the inspector enters measured values, and the inspection only counts as complete once the full quantity has been assessed. The result can be found again by item, batch or goods receipt without anyone opening a binder.

When something deviates: corrective action and effectiveness check

An inspection result outside tolerance is only the beginning. What matters is what happens next. In Caesar a deviation is recorded with a number, assigned to a person and given a deadline. Quality management can see at any time which points are open and who is working on them.

After the action comes the effectiveness check: did the change really eliminate the defect? That question is easily forgotten because daily work carries on. Because Caesar shows it as due, it does not get dropped, and a one-off correction becomes a closed loop.

Inspecting at the machine, not at a desk

Inspection data has the same enemy as all shop-floor data: if capture is awkward, it gets collected and entered later. That is why inspection in Caesar runs in the browser at the workstation, with large targets and few steps. At rough workstations Lorica helps, our IP 65 industrial tablet with a calliper mount, so measuring tool and inspection stay together.

What Caesar does not do is certify you. Caesar records inspections, measured values and actions and makes them traceable on the order. Whether your quality management meets the requirements of your customers or your standard is something you assess with your QA team. What that looks like for your requirements we will work out together in the demo.

FAQ

Can SAP Business One do quality inspection out of the box?

The standard has no dedicated quality module with inspection plans, measured values and action tracking. What SAP B1 provides are items, batches, warehouses and documents. Caesar builds on that and writes back through the official SAP Service Layer, for example when inspected goods are transferred out of the QA warehouse.

Where do we create our inspection plans?

In Caesar, assigned to items flagged as QA-relevant in SAP Business One. If you already have inspection plans in spreadsheets or on paper, they are the best starting point. How we bring them over is something we plan during implementation.

Is Caesar ISO certified, or does it make us audit-proof?

No, and we do not promise that either. A certification concerns your quality management system as a whole, not a single tool. Caesar helps you document inspections, measured values and actions consistently and on the order. The assessment stays with you and your auditor.

What is an effectiveness check?

The check whether a corrective action actually eliminated the defect. It takes place some time after the action, for example after the next few lots. In Caesar it is part of the deviation and becomes due instead of disappearing into a list.

What does the scan function for drawings do?

It brings the drawing straight into the inspection, so the inspector has it in front of them at the workstation. How far that can be used with your drawings is best shown on a real drawing from your production.

Run through an inspection from your production

30 minutes, live from the reference plant. Bring an inspection plan or a drawing and we will set up the inspection in Caesar.

Read on