Manufacturing software for mechanical engineering

In machine building, a delivery date rarely fails because of the big assembly. It fails because of the one turned part that is missing when assembly wants to start.

Manufacturing software for mechanical engineering has one main job: showing whether every part of a machine will be there before assembly begins. Caesar connects production orders, purchasing and inventory from SAP Business One with the shop floor and reserves components for the order that needs them.

In special-purpose machine building especially, every system is a small project: its own bill of materials, its own drawings, a date the customer has in writing. Caesar is the MES for mid-sized machine builders that makes this project character visible on the shop floor instead of managing it in spreadsheets next to the ERP.

Where machine builders lose time

Assembly waits for one part

Almost every component is ready, one is missing. The fitters start, build halfway, wait and rebuild. The date slips even though nearly everything was there.

Parts end up on the wrong order

A stock part meant for machine A is taken for a rush order on machine B. Nobody notices until A is due for assembly.

Multi-level BOMs without an overview

Assembly, sub-assembly, single part: every level has its own production orders. Which one is holding up final assembly right now, nobody sees at a glance.

Dates promised on instinct

Sales names a delivery week before anyone knows whether production and bought-in parts can deliver it. Whether the date holds only becomes clear at the last minute.

What Caesar takes over in machine building

Secure the parts, see the dependencies, base dates on capacity.

Intelligent component reservation

Caesar reserves components for the order they are planned for. A part is not quietly consumed by another order, and before assembly starts you can see what is still missing.

Track every production order

Order tracking shows the status of every order across all operations, including sub-assemblies and in-house parts. Anyone asking why final assembly cannot start finds the open order instead of searching for it.

Scheduling board with a graphical plan

In the Leitstand, Caesar’s APS module, you schedule orders graphically onto your resources. Capacity bottlenecks show up before the date is promised, not after.

Purchasing and inventory in the same picture

Bought-in parts, purchase orders and stock run through the purchasing and inventory modules. Whether a missing part has been ordered or nobody has thought of it yet can be checked directly.

Drawings at the assembly station

The library brings drawings and assembly documents to the workstation. Whoever builds a custom solution opens the document on screen instead of hunting for a printout somewhere in the hall.

Hours on the order

Through shop-floor data capture and time tracking, production and assembly hours land on the order. For the next similar machine you know what the last one really took.

Why assembly ends up waiting for parts

The bottleneck in machine building is rarely a single machine tool. It is simultaneity: for final assembly, many in-house parts, bought-in parts and assemblies have to be ready at the same moment. If one is missing, assembly stops. And because the missing part is often an inconspicuous turned part from a sub-assembly, it is only noticed when the fitter reaches for it.

Component reservation tackles exactly this. Parts intended for an order stay assigned to that order. The question “Do we have everything?” moves from assembly day to a point where you can still react: make it again, order it again, or move the date early and honestly.

Production control in special-purpose machine building: every system a project

In special-purpose machine building there is no series that lets processes settle in. Every system brings new BOM items and new drawings, often with changes while production is already under way. Production control that only works with stable routings does not fit here.

Caesar works on the production orders and bills of materials held in SAP Business One and makes their status visible on the shop floor. If engineering changes something, it is maintained in SAP B1. Because Caesar reads and writes through the official SAP Service Layer, there is no second data store that has to be brought into line.

Delivery reliability starts with the promise

Whether a delivery date holds is not decided in the last week before shipping but at the moment it is promised. Naming a delivery week without knowing how loaded production is means promising something other people have to keep.

The Leitstand makes that promise more reliable. You see which resources are booked in the coming weeks, where a new order fits and what pulling it forward means for the others. Confirmations from shop-floor data capture keep the plan current, so it is not already outdated by Tuesday.

FAQ

Does Caesar manage our bills of materials?

No. Bills of materials, items and production orders stay in SAP Business One, where they belong. Caesar reads them through the official SAP Service Layer and brings them to the shop floor. No second BOM maintenance is created.

How does component reservation work?

Components are assigned to the order they are planned for, so they are not consumed by another order. Which rules should apply to your parts, for example stock parts needed by many orders, we define together during the rollout.

Does Caesar fit one-off production with a lot size of one?

Yes. In special-purpose machine building that is everyday life, not an exception. Every order is started, confirmed and tracked on its own, whether it covers one part or a hundred.

Does Caesar replace our project management software?

No. Caesar controls production: orders, confirmations, material and capacity. Engineering planning, commissioning at the customer’s site or project budgets beyond production are not its focus. Where the line falls for your process, we will see in the demo.

What do we need technically to get started?

SAP Business One as the ERP is currently a requirement. Beyond that, a browser on existing PCs or tablets in production and assembly is enough. Where conditions are rough, Lorica is an IP 65 industrial tablet. You do not need special terminals.

Bring a bill of materials that gives you trouble

30 minutes, live from the reference plant. We go through a real order to show where parts go missing and how Caesar makes that visible earlier.